Job Description
Petrofac
KEY RESPONSIBILITIES:
Welding:
- Monitor and report on the fabrication, installation, erection, and testing processes of process piping, steel structures, tanks, vessels, and metallic items.
 - Review WPS, PQR, and weld maps.
 - Witness Welder Qualifications.
 - Ensure that material/welding consumables are stored and handled correctly, material traceability is maintained when required, and correct materials are used.
 - Ensure a system of welding consumable control is implemented.
 - Ensure welding machines, baking ovens, and quivers are in serviceable condition and, where required, are within the valid calibration period.
 - Perform timely inspections during the fabrication and construction of structures.
 - Check the qualification of welding personnel and the type of materials being used for the process.
 - Perform visual, dimensional, and NDE checks.
 - Monitor welding process parameters for compliance with approved procedures and project specifications.
 - Perform in-process (before/during/after) and final visual inspections.
 - Prepare/Review Inspection reports (Fit-up, Final Visual).
 - Monitor contractor performance, ensuring personnel are qualified and competent to perform allocated tasks and have valid certification where required for the welding techniques in use.
 - Review test reports, including PWHT charts/records, for process output compliance with requirements.
 - Prepare/Review daily welding & NDE reports.
 
Painting/ Coating (preferred additional responsibility)
- Ensure weather conditions are acceptable in line with applicable standards/specifications (Environmental, time, and economic constraints).
 - Ensure manufacturer’s instructions and MSDS are followed while handling and storing Painting/Coating materials and abrasives at the site.
 - Ensure that data sheets are available, material traceability is maintained, and correct material is used.
 - Monitor contractor performance, ensuring Applicators are competent and, where required, have valid certification for the process in use, and equipment is in serviceable condition.
 - Ensure inspection and test equipment is serviceable, within calibration period, and personnel are knowledgeable in its use.
 - Ensure weld area is covered before blasting, where pressure testing is not completed.
 - Ensure protection of flange serration, instruments, etc. before blasting.
 - Ensure surface preparation, blast profile, and cleanliness meet requirements.
 - Continuously monitor surface cleanliness and record surface profile.
 - Monitor wet film thickness during application and application technique.
 - Monitor dry film thickness and recoating intervals.
 - Ensure any identification marks or tags removed or overcoated are replaced.
 - After the full curing activity, conduct visual inspection and specified non-destructive and/or destructive tests.
 - Check for any damages and defects upon completion of each stage of painting/coating works.