Arman Zakaria
About Candidate
Over 20 years of working experience in an oil & gas and petrochemical industries. Mainly involved in construction works for brownfield project, FSO in-situ repair works for life extension (FSO Orkid), hook up and commissioning project, handling process and operation of Naphtha Cracker Plant, Water Injection system, Crude Oil Pumping Station Plant (Sudan), Upstream Plant (ExxonMobil platform – Brownfield) and FSO (Orkid) both in Malaysia and abroad as a Construction Supervisor/Superintendent, Commissioning Supervisor, Team Leader/Technical Representative and Senior Operator. Undertaking the project from construction phase to normal operation. Also supporting Operation & Production i.e. turbine generator upgrading, Glycol vessel replacement, piping in-situ repair or change out , structural repair or valve replacement works and shut down works (i.e TCOT shut down). Experiences in dealing with technical and contractual issues in various projects environmental such as EPCC. Specializing in project commissioning environment, control and troubleshoots process and operation via DCS and at field. Strong believer in team player approach to get the work completed at complex or plant such as dealing with colleagues and vendors or contractors.
Education
Graduated in 1996 with Diploma in mechanical engineering from Universiti Teknologi Malaysia, Skudai Johor.
Work & Experience
• Led onshore and offshore construction for Repair Life Extension project at FSO Orkid. • Managed project planning and POB logistics through colaboration with Offshore team & Contractors. • Forecast potential problems during project execution like resource loading, working conditions, support mechanisms and safety. • Ensure onshore preparation (procurement / fabrication / testing / demobilization) compliance with safety, health and quality requirements • Colaborated with site inspectors and discipline engineers to oversee onshore preparation and offshore execution. • Addressed pressing concerns and coordinated solutions for onshore/offshore chalenges. • Manage and review project risk, recommend solutions or alternatives to mitigate project risk management issues • Perform tasks at global locations when required. • Be aware of contractual obligations of each Purchased Order placed • Host Kick Off Meetings and other expediting status review meetings • Tracked and documented Purchase Orders, supplier performance, and associated delays in database. • Perform expediting visits if required to ensure no delay in delivery of goods and services • Recommend to Manager Procurement for potential Liquidated Damage claims for late deliveries by suppliers • Alert Lead Packages, Manager Procurement and Project Manager on al issues that give impact to cost and delivery schedule • Developed contingency plans to maintain project timelines. • Ensure that regular folow-ups on al suppliers are correctly addressed by telecommunication and/or field visits.
• Facilitated communication between ExxonMobil and offshore operations. • Reported to Construction Planner and Construction Superintendent for overseeing CSC contractor crews working on EMEPMI's Brownfield facilities. • Managed comprehensive aspects of projects including shutdown works, safety measures, and resource alocations. • Communicated and ensured adherence to quality standards throughout projects. • Managed on-site activity planning and implementation. • Ensured workforce adherence by reviewing JSA/SSP according to Owner's requirements. • Assessed and addressed any safety concerns with contractors or vendors. • Responsible in performing any additional work site inspection as per required by owner (ExxonMobil) • Supervised work commencement at the worksite. • Implemented and upheld safety precautions consistently in al daily tasks. • Reviewed and validated work permits for alignment with ExxonMobil's Work Management policies. • Responsible to ensure that work is confined within work permit approved time frame • Evaluate specific safety requirements and instructions for the work activity in consultation with the Operation Supervisor • Delivered essential feedback or SIMOPS activities to platform supervisor or Person In Charge (OIM) • Coordinated and monitored timely delivery of materials to support project execution either by support vessel or chopper. • Conducted thorough inspections of supplies from vendors for compliance with standards. • Acted as the on-site personnel representative for every CSC project handled.
• Responsible in hook up & commissioning and monitoring normal operation of 6 (sixth) numbers of pumping station which is owned by Petrodar Oil Company (PDOC) for delivery of 210,000 bbl/day crude oil along 1400km pipeline from Palouge (South Sudan) to Port of Sudan (North Sudan) • Responsible in an instalation, pre-commissioning, commissioning & start up and developed procedure covering the power generators (Rols Royce), instrument and plant air system, water system (utilities and potable water), instrumentation and PLC control (SCS), close drain and open drain system • Responsible in testing and pre-commissioning activities and developed procedure covering mechanical, piping, electrical and instrumentation • Responsible in developed safety procedure covering evacuation plan and emergency response plan for all 6 (sixth) pumping station • Verified daily work updates and led site discussions with crucial team members. • Monitored and maintained the efficient functioning of six pumping stations over a 1400km distance. • Responsible in monitoring and expedite punch items killing progress to achieved mechanical completion and provisional acceptance certificate • Responsible in coordination / dealing with project team management (PDOC), vendors engineering teams (Wartsila, Rols Royce & etc) and project management team (OGP) to ensure smooth and safe activities at worksite • Responsible in receiving commissioning materials, carry out physical inspection and identified specification by fully coordinate with material controler / coordinator • Responsible in data verification and compiling such as result on the calibration of electrical or instrument devices which is carried out by subcontractors or vendors • Responsible in job delegation to owner (PDOC) commissioning engineers and list down their details scope of works • Coordinated with QAQC team and owner representative in inspection and test plan. • Ensured thorough adherence to safety aspects throughout commissioning processes. • Reported to Lead Commissioning Manager and Project Manager daily and weekly
• Responsible in providing services and maintaining water injection system in smooth operation by monitoring / adjusting an operational parameters from DCS and field at Angsi platform (Petronas Carigali Sdn. Bhd. offshore asset) • Responsible in start-up water injection system i.e Recovery from power failure, emergency shutdown and perform trouble shooting • Responsible to carry out daily report for al an operational readings, adjustments and an inspections to Owner and Management for clarification and justification. • Responsible for chemicals injection rate to enhanced daily production and chemicals inventories on board by expedite any shortage. • Maintain high standard of housekeeping in work areas of responsibility and platform generaly. • Assist, monitoring and witness any activities that performed by vendors or subcontractors and ensure to comply with Petronas Health Safety and Environment Policy. • Responsible in start up the hypo chlorinator unit system and maintained it in smooth operation. • Responsible in performing lab testing such as particle count, turbidity test, BSW testing, EDQ testing and etc. • Responsible with work planned or schedule by owner such as weekly pigging, weekly chemical batching and ensure to comply with Petronas Health, Safety and Environment Policy. • Responsible in management of water injection system at Angsi/Dulang platform such as manpower movement / schedule, advice to platform superintendent & OIM regarding the water injection achievement and etc. • Responsible to detect, identify and react to abnormal conditions onboard that may develop into emergency situations. • Demonstrates and apply personnel commitment to Health, Safety and Environment Policy and Management System • Assisted in the management or care of any emergency which may arise to Petronas Emergency Response Procedure and perform nominated task in Emergency Response Team Participation in HAZOP's also. • Prepare all daily permit (PTW) for designated areas of responsibilities and ensure all activities carried out is comply with Petronas Health, Safety and Environmental Legislation.
• Responsible in an implementation of hook up and commissioning on Field Process Facilities (FP) which is producing 210,000 bbl/day of crude oil under Melut Basin Oil Development Project at Republic of Sudan (South). • Responsible to developed commissioning and start up procedure covering power generator, instrument and plant air system, fire water system, foam proportioning system, heating medium system, flare system, chemical injection system, crude oil processing system and close drain & open drain system • Responsible in construction and commissioning work progress system such as utility system, storage system, water system dehydration module system etc • Responsible in monitoring and an expediting punch killing items to get mechanical completion certificate and provisional acceptance • Responsible in an overall system commissioning works and start up the plant (1st oil) Also perform trouble shoot and process monitoring parameters as per design requirement. • Responsible in developed testing and pre-commissioning procedure covering mechanical, piping, electrical and instrumentation. • Developed plant start up safety procedure covering evacuation and emergency response plan • Responsible in review procedure for plant start up and normal operating which is developed by third party. • Responsible to identify all the resources such as construction and engineering data, planning on any task, generate procedure and job execution such as reinstatement procedure, tightness test methodology etc. • Coordinating with project management consultant (PMC), plant owner (PDOC) and engineering team including witness an inspection, commissioning the system, material receiving, plant start up etc. • Responsible in safety procedure and ensure to comply with owner requirement • Responsible in daily activity report and submit to project management consultant (PMC) and Lead Commissioning Manager / Project Manager for perusal and appraisal. • Responsible in execution of work versus work planning and ensure on time
• Actively involved in commissioning and startup of new 2nd Naphtha Cracker plant covering the waste heat boilers and furnaces system, quenching system crack gas, ethylene and propylene compression system, hydrogenation system, columns distillation and the system, C2 hydro-reactors system and etc. • Maintained equipment including hydrogen reactors, heat exchangers, and centrifugal pumps. • Involved in preparation of standard operating procedure for 2nd Cracker plant and revised as necessary. • Contributed to successful turnaround and startup activities for two separate Naphtha Cracker facilities. • Maintained process parameters in control through DCS system (Yokogawa Centum CS) for achieving production targets and quality. • Responsible with permit to work (PTW) i.e hot work permit, cold work permit, confined space entry work permit. • Maintained adherence to corporate Health, Safety and Environment standards. • Coordinated day and night shift instructions from plant superintendent. • Adhered to and enforced safety rules and procedures. • Coordinated production and maintenance activities to ensure equipment upkeep and repair. • Managed control room activities, ensuring compliance with directives from the shift superintendent when emergencies arose. • Facilitated hands-on instruction for new operators. • Facilitated daily operational tasks, including strategic planning at a supervisory level. • Assisted new operators in performing start-up, shut down and routine tasks. • Ensured seamless two-way communication between integrated plants.