
Mohamad Fareez
About Candidate
I have been deeply interested in an engineering career, especially in the mechanical field, since my school days. I am passionate about my work, quick to learn new skills, and highly motivated to grow, particularly in the oil and gas sector where the mechanical scope is wide and challenging.
With over three years of experience across different roles and industries, I have developed solid practical skills in coordinating activities, providing technical support, troubleshooting, managing documentation, and overseeing projects from start to finish. I am excited to explore new opportunities that will further strengthen my abilities and enhance my performance.
Education
FYP | 2020 : Preparations of Compacted Porous Hydroxyapatite Composite with NaCl by using Solvent Method (study of the Porous Structure of Human Bone by using Biomechanical Engineering) Year 2017: Project designed and built a functional buggy car for a university time-based race competition.
Year 2015: Designed and built an RC airplane prototype, focusing on maximizing flight duration
• A member of Dikir Barat Club. • Member of Boy Scouts. • Member of Sepak Takraw Club • Represented the college in Kepala Batas zone sepak takraw competition (2011). • Member of Hostel Leadership Board (2010/2011). • Represented the college in Inter MJSC Boy Scouts Jamboree Camp (2010). • Participated in the college Kem Jati Diri (2011).
Work & Experience
I led and supervised the construction of infrastructure packages for the ECRL project in Kota Bharu and Pasir Puteh. I managed multidisciplinary teams, planned daily site activities, and ensured productivity, safety, and smooth coordination with clients, consultants, and subcontractors. I reviewed drawings, verified installations, and ensured all works met design and authority requirements. I also handled project documentation such as RF, RFI, MS, ITP, TQ, VO, EOT, and NCR, while overseeing the full construction and commissioning of sewerage systems. I coordinated QA/QC inspections, monitored progress using MS Project, managed procurement, liaised with authorities, tracked quantities and claims, and supported cost control. Additionally, I provided technical guidance to junior staff and managed project close-out, including defects, as-built drawings, and final handover.
I assisted in the design, construction, and maintenance of M&E works for a 3-storey semiconductor factory, including cleanroom facilities. I supervised the installation and commissioning of chilled water and cleanroom HVAC systems, ensuring proper temperature, humidity, and air cleanliness control. I managed flushing, testing, and calibration works for chilled water piping, meters, and equipment, while resolving service issues in line with project and ISO/BS standards. I coordinated QA/QC inspections, prepared site documentation, and monitored subcontractor activities to ensure safe and efficient progress. I also supported BMS integration for the chilled water system, supervised secondary electrical works, and handled major shutdowns for maintenance. In addition, I troubleshot HVAC faults, supervised other M&E systems such as plumbing, compressors, scrubbers, and fire protection, and assisted with planning, reporting, and procurement coordination. I also trained the client on the HVAC control system and CMMS during handover.