bubble425464
About Candidate
Education
Work & Experience
Executed rigging and lifting operations for various equipment and pipework during the FGV Gebeng plant shutdown.Coordinated and performed slinging, hoisting, and positioning of heavy equipment in line with engineering plans.Ensured strict adherence to HSE and Permit-to-Work (PTW) standards during high-risk lifts and elevated work.Assisted in the installation, removal, and alignment of valves, pipes, and plant components as part of the shutdown team.Collaborated with mechanical fitters, supervisors, and QA/QC to ensure timely completion of shutdown tasks.Participated in toolbox talks, risk assessments, and safety briefings, maintaining zero-incident record during shutdown.
Performed blinding and de-blinding of pipelines and valves for safe isolation during shutdown.Executed valve removal, installation, and reassembly, ensuring actuator, bonnet, body, and core alignment.Supported operations in valve flow opening/closing during shutdown and start-up phases.Worked in hazardous areas using SCBA (Self-Contained Breathing Apparatus) for critical joints and confined space tasks.Conducted leak and pressure testing before QA/QC inspection and handover.Adhered to HSE and PTW procedures, ensuring all work met Petronas safety standards.